I went to the site, and walked the entire lower spaces. Upper spaces later this week, after some work is done lower area. Basics of the work:

1. Front entrance is overgrown. Needs to be trimmed back, and cleaned.
2. Steps in back entry to center, need to be cleaned and primed.
3. Rear accessway is mildly overgrown.
4. Stones need clearing around base area.
5. Panels(plex) need to be cleaned
6. Gravel needs to be sifted and laid anew.
7. Steps need to be brushed
8. Walls around steps need to be cleaned and painted anew.

More later with update photos.